EV charging stations in Koper
OpenStreetMap records 28 charging stations for electric vehicles in Koper. They are listed below by distance from the centre of the municipality, with the maximum power, the connector types and the operator.
Charging stations in Koper
| Station | Availability | Operator | Power | Connectors | Bays | Distance |
|---|---|---|---|---|---|---|
| IONITY GmbH IONITY Koper public · 24/7 · paid | — | IONITY GmbH | 460 kW | CCS × 6 | 6 | 0.2 km |
| TRGO ABC KOPER - E3 24/7 | — | PETROL, d.d | 7 kW | Type 2 × 4 | 4 | 0.2 km |
| AVTO PLUS KOPER - E3 24/7 | — | PETROL, d.d | 21 kW | Type 2 × 2 | 2 | 0.2 km |
| KOPER - ULICA 15. MAJA - E3 24/7 | — | PETROL, d.d | 22 kW | Type 2 × 2 | 2 | 0.4 km |
| P+R Semedela Koper public · 24/7 · paid | — | Elektro Ljubljana d.d. | 11 kW | Type 2 × 4 | 4 | 0.5 km |
| Koper, Slovenia public · 24/7 · paid | — | Tesla Energy d.o.o. | 470 kW | CCS × 22 | 20 | 0.6 km |
| Lidl KOPER paid | — | Lidl Slovenija d.o.o. k.d. | 50 kW | Type 2 × 1, CCS × 1 | 2 | 0.6 km |
| BS KP - KOLODVORSKA 24/7 · paid | — | PETROL, d.d | 50 kW | CCS × 2, Type 2 × 2, CHAdeMO × 2 | 6 | 0.6 km |
| Parkirišče Tržnica Koper 24/7 · paid | — | Elektro Ljubljana d.d. | 11 kW | Type 2 × 2 | 2 | 0.6 km |
| Axle d.o.o. | — | — | 22 kW | Type 2 × 1 | 1 | 0.7 km |
| Kolodvorska cesta 9, Koper 24/7 · paid | — | Elektro Ljubljana d.d. | 11 kW | Type 2 × 2 | 2 | 0.8 km |
| Šmarska cesta 2 paid | — | PLENITUDE ON THE ROAD S.R.L. - podružnica Slovenija | 110 kW | CCS × 4, Type 2 × 2 | 6 | 0.9 km |
| VINAKOPER KOPER - E3 24/7 | — | PETROL, d.d | 22 kW | Type 2 × 4 | 4 | 0.9 km |
| Koper Vergerjev trg 24/7 | — | Elektro Ljubljana d.d. | 7 kW | Type 2 × 2 | 2 | 0.9 km |
| Koper Ukmarjev trg 24/7 · paid | — | Elektro Ljubljana d.d. | 11 kW | Type 2 × 2 | 2 | 0.9 km |
| Špar Koper GNE Charging Station paid | — | Elektro Ljublana | 11 kW | Type 2 × 2 | 2 | 1.0 km |
| Potniški terminal 24/7 · free | — | — | — | Schuko × 1, Type 2 × 1 | 2 | 1.0 km |
| Bauhaus Koper paid | — | Elektro Ljubljana d.d. | 40 kW | Type 2 × 7, CCS × 4 | 11 | 1.1 km |
| BS KP - ŠMARSKA public · 24/7 · paid | — | PETROL, d.d | 250 kW | CCS × 4 | 4 | 1.1 km |
| ARRIVA KOPER | — | IMPLERA d.o.o. | 60 kW | CHAdeMO × 2, Type 2 × 1, Schuko × 2 | 5 | 1.1 km |
| KP - MERCATOR CENTER KOPER 24/7 | — | PETROL, d.d | 22 kW | Type 2 × 4 | 4 | 1.2 km |
| Porsche Koper 24/7 | — | PORSCHE SLOVENIJA, d.o.o. | 25 kW | Type 2 × 1, CHAdeMO × 1, CCS × 1 | 3 | 1.4 km |
| Lidl Koper paid | — | Lidl Slovenija d.o.o. k.d. | 50 kW | CCS × 1, Type 2 × 1, CHAdeMO × 1 | 3 | 1.4 km |
| 114 paid | — | — | 11 kW | Type 2 × 1 | 1 | 2.7 km |
| AMZS Center Koper 24/7 · paid | — | Efrend d.o.o | 11 kW | Type 2 × 2 | 2 | 2.9 km |
| Charging station public | — | — | — | Schuko × 1 | 4 | 5.8 km |
| Vinska fontana Marezige public · 24/7 | — | PORSCHE SLOVENIJA, d.o.o. | 11 kW | Type 2 × 2 | 2 | 6.6 km |
| Charging station public | — | — | — | — | — | 11.1 km |
See the charging stations on the map →Property prices
For stations in the official register the page also shows how many bays are free when it loads, from NAP/Prometej (IDACS). For stations the register does not cover there is no such reading. It is a few minutes old, and the operator's own app has the last word.
Charging station data: © OpenStreetMap (ODbL) and OpenChargeMap (CC BY-SA 4.0), as of 1 Sept 2026; Charging point register: NAP/Prometej (IDACS)
Frequently asked questions
How many EV charging stations are there in Koper?
OpenStreetMap records 28 charging stations in Koper. The snapshot was taken on 1 Sept 2026 and is maintained by the OpenStreetMap community, so the newest station may not be in it yet.
Where is the nearest fast charger in Koper?
The nearest station of at least 50 kW is IONITY GmbH IONITY Koper, 0.2 km from the centre of the municipality, rated 460 kW. Power is often left unrecorded in OpenStreetMap, so there may well be a closer one.
Does this page show whether a bay is free?
For stations in the official register it does: how many bays are free is written into the table when the page loads, from the NAP/Prometej (IDACS) status feed. Stations the register does not cover carry no such reading, and the directory itself is as of 1 Sept 2026. What a charge costs is what the operator's own app answers.