Draga SlovenijaDraga Slovenija

Samostojne hiše Jurovski dol

last unitscompletion 2025Available 2verified 20 Sept 2026

Jurovski Dol

from €288,000

Key facts

Available2
Price from€288,000
Expected completion2025
Units in total23
Unit typesenodružinske hiše, dvoetažne (P+M)
Plot area1,483m²2 plots · cadastral community 529 JUROVSKI DOL

About the development

Novo naselje 23 samostojnih enodružinskih hiš v Jurovskem Dolu (občina Sveti Jurij v Slovenskih goricah) je grajeno s sistemom Porotherm Profi. Na voljo je še zadnja enota velikosti 149 m2, zgrajena leta 2026. Prodaja poteka preko agencije BAZA realestate.

How it has moved

  1. planned
  2. presale
  3. under construction
  4. for sale
  5. last units
  6. sold out
  7. completed

Follow this development

We will write to you when its status, starting price or number of available units changes. Free, and you can switch it off at any time.

Watch this project

A free analysis of this location

Check the plot, the prices achieved nearby, flood and landslide exposure and the seismic zone. No sign-up needed.

Open the free analysisOpen on the mapDeveloper's website

Sales on the plots and in the buildings

No sale has been recorded on these plots, or in the buildings on them, yet, which is what a development not yet entered in the register looks like.

Deals around the site

Units sold19
Radius300m
Median1,603€/m²

Median price by year

YearMedianSales
2,0241,869 €/m²3
2,0231,500 €/m²11
2,0221,561 €/m²2
DateTypeAreaAmount€/m²New buildDistance
27 Nov 2024Apartment67 m²€123,4001,645270 m
17 Sept 2024Apartment59 m²€111,0001,869270 m
4 Jun 2024House102 m²€293,0002,628300 m
30 Nov 2023House102 m²sign in300 m
29 May 2023Apartment59 m²sign in270 m
20 Apr 2023Apartment58 m²sign inyes270 m
21 Feb 2023Apartment58 m²sign inyes270 m
21 Feb 2023Apartment59 m²sign inyes270 m
21 Feb 2023Apartment59 m²sign inyes270 m
17 Feb 2023Apartment59 m²sign inyes270 m

16 more recorded deals are locked. Signing in unlocks them.

Flats and houses sold on the open market in the last 6 years, within 300 m of the development. From the property transaction register (ETN, GURS).

Cadastre

Plot

  • 29/10 on the mapcadastral community 529 JUROVSKI DOL · 717 m²
  • 29/11 on the mapcadastral community 529 JUROVSKI DOL · 766 m²

Building

  • 529-493on parcel 29/10 · Year built: 2025 · Floors: 2 · Dwellings: 1
  • 529-492on parcel 29/11 · Year built: 2025 · Floors: 2 · Dwellings: 1

Satellite image

Satellite image: Esri World Imagery · © Esri, Maxar, Earthstar Geographics · captured 1 May 2025 · source GURS, 25 cm · The dashed outline marks the development's plots. · Imagery timeline · Google Maps (satellite)

Spatial plan

  • Občinski prostorski načrt Občine Sveti Jurij v Slovenskih goricah Official record on the mapAdopted · In force · adopted 18 Oct 2018 · in force from 1 Dec 2018 · area 3,072.2 ha
  • Tehnična posodobitev grafičnega prikaza namenske rabe prostora Občinskega prostorskega načrta občine Sveti Jurij v Slovenskih goricah Official record on the mapAdopted · In force · adopted 26 Jun 2025 · in force from 24 Jul 2025 · area 3,071.8 ha
  • Spremembe in dopolnitve občinskega prostorskega načrta občine Sveti Jurij v Slovenskih goricah Official record on the mapAdopted · In force · adopted 8 Oct 2020 · in force from 28 Oct 2020 · area 3,072.2 ha

Land use

  • SS Stanovanjske površinePlanning unit (EUP): JD-12 · Detailed plan (OPPN) required: no · Source: Tehnična posodobitev grafičnega prikaza namenske rabe prostora Občinskega prostorskega načrta občine Sveti Jurij v Slovenskih goricah, in force from 24 Jul 2025

From the register of spatial acts (MNVP). The official text and drawings are on the act's own page in the spatial information system.

Building permits and construction starts

DateActProcedureAdministrative unitDistance
20 Feb 2026Occupancy permitUporabno dovoljenje brez tehničnega pregledaUpravna enota Lenart10 mon the map
15 May 2025Building permitGradbeno dovoljenje za nezahteven objektUpravna enota Lenart140 mon the map
25 Sept 2024Building permitGradbeno dovoljenjeUpravna enota Lenart40 mon the map
11 Apr 2024Occupancy permitUporabno dovoljenje brez tehničnega pregledaUpravna enota Lenart50 mon the map
23 May 2023Building permitGradbeno dovoljenjeUpravna enota Lenart40 mon the map
18 May 2023Building permitSprememba in dopolnitev gradbenega dovoljenjaUpravna enota Lenart10 mon the map
8 Apr 2023Building permitGradbeno dovoljenjeUpravna enota Lenart40 mon the map
16 Feb 2023Building permitGradbeno dovoljenjeUpravna enota Lenart10 mon the map
31 Aug 2022Building permitGradbeno dovoljenje za nezahteven objektUpravna enota Lenart40 mon the map
23 Apr 2022Building permitGradbeno dovoljenje za nezahteven objektUE LENART50 mon the map
2 Jul 2021Building permitGradbeno dovoljenjeUE LENART50 mon the map
3 Mar 2020Building permitGradbeno dovoljenje za nezahteven objektUE LENART140 mon the map

From the register of administrative acts (MNVP). Acts filed on the development's own buildings and within 150 m of it. The register publishes no unit count on an act.

The neighbourhood

Nearby

Forest161m

Warnings and constraints

  • no kindergarten or school nearby
  • greenery or water ≈161 m away
  • school district OŠ Sv. Jurij

Public registers

The municipality in numbers

Population, wages, sales and prices for Sveti Jurij v Slovenskih goricah.

Median flat price2,046€/m²Sveti Jurij v Slovenskih goricah

View municipal statistics

Similar developments nearby

Open the free analysisOpen on the map

Something missing or wrong?

We keep this entry by hand. Report a figure that does not hold or, if you are the developer, fill in what is missing.

Report an errorSuggest another development

AI chat

Ask the data, in plain language

The AI chat finds the answer in the official register and shows it with a table you can download and a link into the map. Free; it only needs an account.

For example: Which municipalities issued the most building permits last year?

Open the AI chat

AI chat