EV charging stations in Sveti Andraž v Slovenskih goricah
OpenStreetMap records no electric vehicle charging station in Sveti Andraž v Slovenskih goricah. The nearest ones in neighbouring municipalities are listed below, by distance from the centre of the municipality.
The nearest charging stations
| Station | Municipality | Availability | Operator | Power | Connectors | Bays | Distance |
|---|---|---|---|---|---|---|---|
| Občina Cerkvenjak | Cerkvenjak | — | Vizije mobilnosti d.o.o. | 50 kW | Type 2 (cable) × 4, CCS × 2 | 6 | 4.1 km |
| GRABONOŠ JUG 24/7 · paid | Sveti Jurij ob Ščavnici | — | PETROL, d.d | 50 kW | CCS × 1, CHAdeMO × 1, Type 2 × 1 | 3 | 7.2 km |
| GRABONOŠ SEVER 24/7 · paid | Sveti Jurij ob Ščavnici | — | PETROL, d.d | 150 kW | CCS × 1 | 1 | 7.2 km |
| Občina Destrnik 24/7 | Destrnik | — | PETROL, d.d | 22 kW | Type 2 × 2 | 2 | 7.5 km |
| Janežovski Vrh 41 24/7 · paid | Destrnik | — | MEGA M d.o.o. | 22 kW | Type 2 × 2 | 2 | 7.6 km |
See the charging stations on the map →Property prices
For stations in the official register the page also shows how many bays are free when it loads, from NAP/Prometej (IDACS). For stations the register does not cover there is no such reading. It is a few minutes old, and the operator's own app has the last word.
Charging station data: © OpenStreetMap (ODbL) and OpenChargeMap (CC BY-SA 4.0), as of 1 Sept 2026; Charging point register: NAP/Prometej (IDACS)
Frequently asked questions
How many EV charging stations are there in Sveti Andraž v Slovenskih goricah?
OpenStreetMap records no charging station in Sveti Andraž v Slovenskih goricah. The nearest one is Občina Cerkvenjak in Cerkvenjak, 4.1 km from the centre of the municipality.
Where is the nearest fast charger in Sveti Andraž v Slovenskih goricah?
The nearest station of at least 50 kW is Občina Cerkvenjak in Cerkvenjak, 4.1 km from the centre of the municipality, rated 50 kW. Power is often left unrecorded in OpenStreetMap, so there may well be a closer one.
Does this page show whether a bay is free?
For stations in the official register it does: how many bays are free is written into the table when the page loads, from the NAP/Prometej (IDACS) status feed. Stations the register does not cover carry no such reading, and the directory itself is as of 1 Sept 2026. What a charge costs is what the operator's own app answers.