EV charging stations in Markovci
OpenStreetMap records no electric vehicle charging station in Markovci. The nearest ones in neighbouring municipalities are listed below, by distance from the centre of the municipality.
The nearest charging stations
| Station | Municipality | Availability | Operator | Power | Connectors | Bays | Distance |
|---|---|---|---|---|---|---|---|
| Občina Dornava 24/7 | Dornava | — | PETROL, d.d | 22 kW | Type 2 × 1 | 1 | 4.2 km |
| GORIŠNICA 24/7 | Gorišnica | — | PETROL, d.d | 22 kW | Type 2 × 2 | 2 | 4.7 km |
| VIDEM 24/7 | Videm | — | PETROL, d.d | 22 kW | Type 2 × 2 | 2 | 5.1 km |
| Javne službe Ptuj - pokopališče 24/7 · paid | Ptuj | — | MEGA M d.o.o. | 22 kW | Type 2 × 2 | 2 | 5.1 km |
| Cirkulane Dolane AC paid | Cirkulane | — | IMPLERA d.o.o. | 11 kW | Schuko × 2, Type 2 × 1 | 3 | 5.4 km |
See the charging stations on the map →Property prices
For stations in the official register the page also shows how many bays are free when it loads, from NAP/Prometej (IDACS). For stations the register does not cover there is no such reading. It is a few minutes old, and the operator's own app has the last word.
Charging station data: © OpenStreetMap (ODbL) and OpenChargeMap (CC BY-SA 4.0), as of 1 Sept 2026; Charging point register: NAP/Prometej (IDACS)
Frequently asked questions
How many EV charging stations are there in Markovci?
OpenStreetMap records no charging station in Markovci. The nearest one is Občina Dornava in Dornava, 4.2 km from the centre of the municipality.
Where is the nearest fast charger in Markovci?
The nearest station of at least 50 kW is Lidl PTUJ in Ptuj, 6.2 km from the centre of the municipality, rated 50 kW. Power is often left unrecorded in OpenStreetMap, so there may well be a closer one.
Does this page show whether a bay is free?
For stations in the official register it does: how many bays are free is written into the table when the page loads, from the NAP/Prometej (IDACS) status feed. Stations the register does not cover carry no such reading, and the directory itself is as of 1 Sept 2026. What a charge costs is what the operator's own app answers.