Draga SlovenijaDraga Slovenija

EV charging stations in Gornja Radgona

OpenStreetMap records 12 charging stations for electric vehicles in Gornja Radgona. They are listed below by distance from the centre of the municipality, with the maximum power, the connector types and the operator.

Charging stations in Gornja Radgona

StationAvailabilityOperatorPowerConnectorsBaysDistance
Radgona Trg Svobode
paid
VOLTRIS d.o.o.11 kWType 2 × 440.1 km
Radgona Dvorana
paid
VOLTRIS d.o.o.50 kWCCS × 1, Type 2 × 120.3 km
GORNJA RADGONA
24/7
PETROL, d.d17 kWType 2 × 220.3 km
Radgona Vrtec
paid
VOLTRIS d.o.o.6 kWType 2 × 220.3 km
Radgona Pokopališče
paid
VOLTRIS d.o.o.5 kWType 2 × 220.3 km
E+ polnilna postaja Elektro GR
24/7
Energija plus d.o.o.22 kWType 2 × 220.4 km
Radgona Stadion
paid
VOLTRIS d.o.o.4 kWType 2 × 220.5 km
Radgona Kerenčičeva
paid
VOLTRIS d.o.o.4 kWType 2 × 440.5 km
Maximus Gornja Radgona
24/7 · paid
Elektro Ljubljana d.d.22 kWType 2 × 220.5 km
Lidl GORNJA RADGONA
24/7 · paid
Lidl Slovenija d.o.o. k.d.50 kWType 2 × 1, CCS × 1, CHAdeMO × 131.0 km
Radgona Ljutomerska
paid
VOLTRIS d.o.o.11 kWType 2 × 112.1 km
Radgona Negova
paid
VOLTRIS d.o.o.4 kWType 2 × 228.6 km

See the charging stations on the map →Property prices

For stations in the official register the page also shows how many bays are free when it loads, from NAP/Prometej (IDACS). For stations the register does not cover there is no such reading. It is a few minutes old, and the operator's own app has the last word.

Charging station data: © OpenStreetMap (ODbL) and OpenChargeMap (CC BY-SA 4.0), as of 1 Sept 2026; Charging point register: NAP/Prometej (IDACS)

Frequently asked questions

How many EV charging stations are there in Gornja Radgona?

OpenStreetMap records 12 charging stations in Gornja Radgona. The snapshot was taken on 1 Sept 2026 and is maintained by the OpenStreetMap community, so the newest station may not be in it yet.

Where is the nearest fast charger in Gornja Radgona?

The nearest station of at least 50 kW is Radgona Dvorana, 0.3 km from the centre of the municipality, rated 50 kW. Power is often left unrecorded in OpenStreetMap, so there may well be a closer one.

Does this page show whether a bay is free?

For stations in the official register it does: how many bays are free is written into the table when the page loads, from the NAP/Prometej (IDACS) status feed. Stations the register does not cover carry no such reading, and the directory itself is as of 1 Sept 2026. What a charge costs is what the operator's own app answers.

AI chat

Ask the data, in plain language

The AI chat finds the answer in the official register and shows it with a table you can download and a link into the map. Free; it only needs an account.

For example: Where are the EV charging stations in Gornja Radgona?

Open the AI chat

AI chat