EV charging stations in Braslovče
OpenStreetMap records no electric vehicle charging station in Braslovče. The nearest ones in neighbouring municipalities are listed below, by distance from the centre of the municipality.
The nearest charging stations
| Station | Municipality | Availability | Operator | Power | Connectors | Bays | Distance |
|---|---|---|---|---|---|---|---|
| Mladinski center Šmartno ob Paki 24/7 · paid | Šmartno ob Paki | — | MEGA M d.o.o. | 22 kW | Type 2 × 2 | 2 | 5.0 km |
| Novergija d.o.o. 24/7 · paid | Polzela | — | PETROL, d.d | 22 kW | Type 2 × 4 | 4 | 5.3 km |
| Tabor za občino DC | Tabor | — | IMPLERA d.o.o. | 10 kW | CHAdeMO × 1, Schuko × 2, CCS × 1 | 4 | 5.6 km |
| Kmetijska zadruga Šaleška Dolina, z.o.o. - Šmartno ob Paki 24/7 · paid | Šmartno ob Paki | — | MEGA M d.o.o. | 7 kW | Type 2 × 2 | 2 | 5.7 km |
| Hotel Grof 24/7 | Vransko | — | PORSCHE SLOVENIJA, d.o.o. | 11 kW | Type 2 × 4 | 4 | 5.9 km |
See the charging stations on the map →Property prices
For stations in the official register the page also shows how many bays are free when it loads, from NAP/Prometej (IDACS). For stations the register does not cover there is no such reading. It is a few minutes old, and the operator's own app has the last word.
Charging station data: © OpenStreetMap (ODbL) and OpenChargeMap (CC BY-SA 4.0), as of 1 Sept 2026; Charging point register: NAP/Prometej (IDACS)
Frequently asked questions
How many EV charging stations are there in Braslovče?
OpenStreetMap records no charging station in Braslovče. The nearest one is Mladinski center Šmartno ob Paki in Šmartno ob Paki, 5.0 km from the centre of the municipality.
Where is the nearest fast charger in Braslovče?
The nearest station of at least 50 kW is Biomasa d.o.o. in Nazarje, 8.3 km from the centre of the municipality, rated 320 kW. Power is often left unrecorded in OpenStreetMap, so there may well be a closer one.
Does this page show whether a bay is free?
For stations in the official register it does: how many bays are free is written into the table when the page loads, from the NAP/Prometej (IDACS) status feed. Stations the register does not cover carry no such reading, and the directory itself is as of 1 Sept 2026. What a charge costs is what the operator's own app answers.